Cuma waste water treatment plant

In 2009 WTE has supplied the aeration system for the Cuma wastewater treatment plant, located in the Naples area and one of the biggest in south Italy with 14 tanks where a total of 29.400 Airtech 9” disc diffusers with EPDM membrane were installed.

After 9 years the company operating the plant decided to refurbish the diffusers and their choice was to choose again our diffusers due to the good results of the previous ones. The installation will be completed most likely in 2018.

From those time we have changed some components of the system to improve the resistance or just to simplify their installation but the policy of WTE is to provide scalable components in order to allow to use new designed parts even in seasoned installations.